Clear & Pure

Vigorous & Vitality · V&V

AcneShot

Anti-Acne Serum S.O.S

Suitable forOily, combination and acne-prone skin, including hormonal breakouts.
Pack size (Word brief)30 ml

Product Overview

An instant anti-acne serum by Vigorous & Vitality combining Salicylic Acid, Zinc PCA, Tea Tree Extract, and Sulfur to help dry out blemishes and reduce visible inflammation. Niacinamide, Hyaluronic Acid, and Panthenol help keep the skin hydrated during use. The serum has a lightweight texture, absorbs quickly, and is designed for daily topical application. Its formula helps control excess skin oil and the appearance of post-acne marks.

Back to all cosmetics

Product Information

Catalogue overview and complete supplementary Word product brief.

Extended Product Description

Vigorous & Vitality Instant Acne Serum features a powerful and specialized formula with active ingredients like salicylic acid, zinc PCA, tea tree extract, and sulfur to quickly dry out pimples and reduce redness and inflammation. Moisturizing agents such as niacinamide, hyaluronic acid, and panthenol help keep the skin hydrated and irritation-free during treatment. With its lightweight texture and fast absorption, this serum is ideal for daily spot treatment and helps prevent post-acne marks while balancing excess oil

Recommended Skin / Hair Types

Suitable for oily, combination, acne-prone skin, and hormonal breakouts

Formula Statements (Word Brief)

Free from sulfates, parabens, alcohol, silicones, artificial colors, and fragrances

Ingredients & Active Components

Key ingredients in the catalogue, plus Word formulation details where supplied.

Catalogue Key Ingredients

  • Niacinamide
  • Salicylic Acid
  • Zinc PCA
  • Aloe Vera Extract
  • Tea Tree Leaf Extract
  • Hyaluronic Acid
  • Sulfur
  • Allantoin
  • Panthenol

Word Highlighted Ingredients

  • Salicylic acid
  • Zinc PCA
  • Tea tree extract
  • Niacinamide
  • Hyaluronic acid
  • Sulfur

Full Ingredients (Word)

Deionized water, Niacinamide, Glycerin, Salicylic acid, Propylene glycol, Melaleuca alternifolia leaf extract, Triethanol amine, Zinc PCA, Aloe barbadensis extract, AC.NET,Polylysine,Sulfur,PEG-40, EuxylPe9o, Retinyl palmitate, Panthenol, Allantoin, Tocopheryl acetate, Patch2o,Xanthan gum,Citric acid, Disodium EDTA

Reproduced from the supplied Word formulation; verify against final product packaging before publication.

Key Actives — Detailed Functions

Ingredient notes supplied in the English-language Word material.

Salicylic Acid

Salicylic acid is a chemical exfoliant that penetrates deep into pores, removing oil and impurities, helping to treat acne and prevent future breakouts

Zinc PCA

Zinc PCA is an antibacterial and oil-regulating compound, highly effective for oily and acne-prone skin

Tea Tree Extract

Tea tree extract has antibacterial and anti-inflammatory properties, helping to reduce redness and inflammation caused by acne

Niacinamide

Niacinamide is a form of vitamin B3 that helps reduce inflammation, brighten skin, and strengthen the skin's protective barrier

Hyaluronic Acid

Hyaluronic acid is a powerful humectant that helps retain moisture in the skin, preventing dryness and irritation

How to Use & Safety

Usage information and safety notes from the available product documents.

Directions for Use

Cleanse your face with a mild cleanser and pat dry. Then apply a few drops of the serum directly to the acne spots and gently spread it. Use this serum daily, either in the morning or at night, and avoid contact with the eyes

Cautions & Storage

  • For external and topical use only
  • Avoid contact with eyes and sensitive areas such as around the eyes and lips
  • If irritation, redness, or sensitivity occurs, discontinue use and consult a doctor
  • Perform a patch test before use to ensure no allergic reactions
  • Keep out of reach of children
  • If pregnant or breastfeeding, consult a doctor before use
  • If you have sensitive skin or specific skin conditions, avoid self-use and seek advice from a dermatologist

Additional Technical Notes

Extended notes and references from the Word documents.

Manufacturing & Packaging Information

  • Under license of Herabiotics UK
  • Produced in giah faravar khavarmianeh
  • Ordered by sarv sabz behdasht & darman as exclusive representative of herabiotics UK product
  • Nominal pack size (Word): 30 ml

Charts & Research Reports

Visuals reproduced from the supplied Word tables and PDF documents.

Source-provided figures are reproduced as supplied. Study methodology and independent verification have not been provided; review before using them as clinical product claims.

Original Report Charts

English-language chart images rendered directly from the provided PDF reports.

Instant Acne Serum Progress Charts

2 pages · Provided reference PDF

Open original PDF